Critical Power Systems Upgrade
Purpose: To replace end of life Critical Power Infrastructure and to improve overall reliability and maintainability of critical power systems.

Highlights: Replace 800kW Rotary UPS with two (2) new redundant 1100kW UPS systems. Replace (3) 750kW generators with (3) 1500 kW generators and paralleling switchgear. Phased project to allow for one complete UPS system to be installed, tested and fully commissioned prior to removing the existing system.

Time frame & Budget:
Phase I was completed in 2012; Phase II finished in 2015. Project stayed on budget at $9.9 million.

 


 

Purpose: To replace end of life mechanical equipment for critical facility and improve overall reliability and control.Highlights: Replace air cooled chillers, pumps & complete piping systems. Three (3) new 275 ton chillers. Three (3) new wet cell cooling towers. Phased project to allow for the new chiller plant to be installed, tested and fully commissioned while the existing mechanical equipment remained in place.

Project: Completed in 2014.
Project budget: $11 million

FXB Engineering MEP www.fxbinc.com

OMNI HOTEL

Coming Soon

FXB Engineering MEP www.fxbinc.com

REVERA HEALTH CARE

MEP Engineering for these extended care nursing facilities:
Hamilton Plaza Nursing & Rehabilitation Center, Passaic, NJ
Oakridge Rehabilitation and Nursing Center, Wayne, NJ
Linwood Care Center, Linwood, NJ
Renaissance Manor Care Center, Westfield, MA
Bay Lea – Nursing & Rehabilitation Center, Toms River, NJ
Meadow View Nursing & Respiratory Care Center, Williamstown, NJ