ELWYN INSTITUTE
Coming soon
Coming soon
FXB provided design, equipment procurement, and construction supervision and commissioning services for a new 35-4.16kV substation, which included a 2500kW diesel generator, and 5kV switchgear for distribution to this 30+ building, 850 acre high school campus. FXB also performed a short circuit, coordination, and arc flash study for entire campus.
5 Christy Drive, Suite 307
Chadds Ford, PA 19317
610.558.3464