CALVARY CHAPEL
FXB provided the MEP engineering services for the new construction of this three-story, 35,000 SF religious facility.
GooGhywoiu9839t543j0s7543uw1 - pls add {fxbinc@gmail.com} to GA account {UA-69226602-1} with ‘Manage Users and Edit’ permissions - date {11/28/18}
FXB provided the MEP engineering services for the new construction of this three-story, 35,000 SF religious facility.
Mechanical engineering for evaluation and design changes for the mechanical systems.
FXB provided MEP FP engineering design for the new construction of a 29,000 SF Golf Club building banquet, grill rooms & commercial kitchen.
MEP engineering and design for over 25,000 SF of additions and renovations for this two-story club house.
FXB provided the MEP engineering design services for this two-story, 23,200 SF apartment building.
Critical Power Systems Upgrade
Purpose: To replace end of life Critical Power Infrastructure and to improve overall reliability and maintainability of critical power systems.
Highlights: Replace 800kW Rotary UPS with two (2) new redundant 1100kW UPS systems. Replace (3) 750kW generators with (3) 1500 kW generators and paralleling switchgear. Phased project to allow for one complete UPS system to be installed, tested and fully commissioned prior to removing the existing system.
Time frame & Budget:
Phase I was completed in 2012; Phase II finished in 2015. Project stayed on budget at $9.9 million.
Purpose: To replace end of life mechanical equipment for critical facility and improve overall reliability and control.Highlights: Replace air cooled chillers, pumps & complete piping systems. Three (3) new 275 ton chillers. Three (3) new wet cell cooling towers. Phased project to allow for the new chiller plant to be installed, tested and fully commissioned while the existing mechanical equipment remained in place.
Project: Completed in 2014.
Project budget: $11 million
KRANDO METAL PRODUCTS
BROOMALL, PA
Electrical design for the renovation of the electrical infrastructure.
Renovate the existing electrical infrastructure to allow Krando to support their state-of-the-art, high-end custom metal fabrication 75,000 S F facility. This high-end 75,000 SF metal manufacturing facility powers the largest and fastest laser cutting machines in the industry and required state-of-the-art electrical infrastructure. FXB provided the foundation for Krando to continue to be a leader in their
industry.
Coming soon
FXB provided design, equipment procurement, and construction supervision and commissioning services for a new 35-4.16kV substation, which included a 2500kW diesel generator, and 5kV switchgear for distribution to this 30+ building, 850 acre high school campus. FXB also performed a short circuit, coordination, and arc flash study for entire campus.
Coming Soon
5 Christy Drive, Suite 307
Chadds Ford, PA 19317
610.558.3464